Announcements
Announcements made in the following years can be viewed by clicking on the appropriate link:
All announcements published in all years are displayed below.
You can also search our announcements database by post date or title. To search by post date, please enter the month and year numerically as mm-yyyy (eg. 03-2016).
There are 54 announcements for all years in our database
Displaying page 8 out of 11
[ Top ] - [ Prev ] - [ Next ] - [ Bottom ]
Full details of scheduled server and network maintenance, software upgrades, and other important Service, Network, and Server Announcements are displayed below.
Cymnet Announcements - all years
PHP Upgrade - Buckley (Completed)
The scheduled work to upgrade PHP from 5.3 to 5.4 on 21/08/2014 was not entirely successful, and therefore we are re-scheduling the work for the 12/09/2014 at 8am. We will update the announcement when the work is complete, and with further details if there are any problems encountered. Please see the original announcement for further information.
Update 1
The main PHP stack is now upgraded, the secondary stacks are in progress.
Update 2
This is now complete.
Posted: 9 September 2014
By: Paul Dancey
Network Switch Maintenance - Buckley (Completed)
During the core network upgrade on Tuesday 19th August, we identified some unanticipated problems with the link aggregation between the two switches that provide network connectivity this server. We would like to iterate that this problem has not been service affecting.
We have therefore scheduled the implementation of a fix for this issue during the following maintenance window:
Tuesday 16th September, 2014 from 1:00am - 3:00am BST
During this period, loss of network connectivity is likely to happen whilst we reconfigure the switches in this rack. This is necessary to restore the maximum throughput these switches can achieve to its full capacity. The downtime is estimated to be around around 10 - 20 minutes in total during this period.
This maintenance is being performed in a way that if any issues occur, or the allotted time frame is exceeded, we can roll back the configuration and restore service within a couple of minutes.
We apologize for the inconvenience caused, however this maintenance is essential to restore full service.
Posted: 9 September 2014
By: Paul Dancey
PHP Upgrade (Completed)
The upgrade first announced in our post of 13 August 2014 is now in progress, we will update this announcement once completed.
Update
The php installation on all servers has now been upgraded to 5.4, with the exception of Buckley. Unfortunately Buckley can not currently be upgraded currently due to technical issues encountered, we will announce our plans regarding Buckley in due course.
Posted: 21 August 2014
By: Paul Dancey
Core Network Upgrade (Completed)
The upgrade is taking longer than expected, however, the majority of the work has been completed. We will update this announcement once the last of the work has been finished.
Update 1
Unfortunately we are still experiencing some issues with the last leg of the maintenance, which is causing it to take longer than expected. Our engineers are continuing to work on this issue, and hope to have it completed soon.
Update 2
This maintenance window is now closed.
Update 3
During the maintenance window we encountered some issues that were not anticipated during testing which unfortunately in some cases extended the estimated downtime to up to two hours overnight.
Posted: 19 August 2014
By: Paul Dancey
Core Network Upgrade (Completed)
We will shortly be beginning this maintenance. As above, there may be periods during the next few hours where network connectivity is impacted. Further updates will follow with an all-clear notice when work is complete.
Posted: 18 August 2014
By: Paul Dancey
Cymnet Announcements last updated: 29 May 2018 at 12:36:18 AM
Displaying page 8 out of 11
[ Top ] - [ Prev ] - [ Next ] - [ Bottom ]